Demolition The Subcontractor shall strip out and dispose of (unless noted otherwise) the following items, as indicated on the design drawings: • Partitions • Doors • Porcelain tiles • Ceiling baffles and supports (to be stored and reinstalled later) • Glazing • Builders work openings (including necessary modifications to wall framework) • Door penetrations • Column cladding • Screens ...
- Architectural services for buildings
- Architectural, engineering and planning services
- United Kingdom
- London