Railway viaduct construction work
This is a brief excerpt of the tender. Please log in to view the full tender.
SCOPE OF WORK: Design and Construction of Main Line Elevated Viaduct from Agra Cantt. Metro Station to Kalindi Vihar Metro Station Chainage (-77m) to 15016m] including Viaduct Connection with Ramp (Chainage 0.00m to 2610m) from (nearby) Sadar Bazar Metro Station to existing Corridor-1 Depot at PAC ground & Corridor-2 Depot ...
CPV Codes
- Railway viaduct construction work
NUTS Codes
- United Kingdom
- North East England
- North West England
- Yorkshire and the Humber
- East Midlands
- West Midlands
- East of England
- London
- South East England
- South West England
- Wales
- Scotland
- Northern Ireland