Thames Tideway Tunnel - C405 Main Works West - Architectural Bronze Artwork at DRMST
This is a brief excerpt of the tender. Please log in to view the full tender.
The Thames Tideway Tunnel project (the Project) will control CSO discharges by intercepting and diverting combined sewage flows into a new storage and transfer tunnel. The main tunnel will run from Acton Storm Tanks in west London to Abbey Mills Pumping Station in the east, where it will connect to ...
CPV Codes
- Structural steelworks
- Metalworking
- Architectural design services
- Engineering design services
NUTS Codes
- United Kingdom
- London